© KNK Engineering Consulting Corporation • www.knkengineering.com
Defense Projects
Defense Projects
C.W. Bill Young Armed Forces Reserve Center, Pinellas County, Florida: Electrical Engineer for the design of a new 58-acre complex with over 230,000 square feet of buildings designed around LEED sustainable design requirements.
Florida Army National Guard Readiness Center at Snake Creek, Miramar, Florida: Electrical Engineer for the design of a new 108,000-square-foot, a modern, state-of-the-art, training facility that will have the capability to provide support and shelter for the state of Florida in the event of a natural disaster, and heighten regional security for Florida residents in the wake of terrorism.
Community Center, Fort Buchanan, San Juan, Puerto Rico: Electrical Engineer for the design of renovation of a 36,750-square-foot officer club building.
Maintenance Hangar A936, Key West Naval Air Station, Florida: Electrical Engineer for the design of the refurbishment of existing 40-year-old hangar.
Building 89, Naval Air Station Panama City, Florida: Electrical Engineer for the design of renovation of a 22,000 square-foot office building to support Seal Delivery Vehicle Training group.
NAVO Data Processing Center, Stennis Space Center, Mississippi: Electrical Engineer for the design of renovation of four existing buildings totaling 165,000 square feet to provide a secure data center for Critical Infrastructure Information to support the Navy and other federal agencies.
Lift Stations Replacement, Naval Station Truman Annex Keywest, Florida: Electrical Engineer for the design of 13 sanitary lift stations with remote capability to turning the pumps “on/off”, telemetry system.
Sanitary Sewer Systems Replacement, Naval Station Trumbo Point Keywest, Florida: Electrical Engineer for the design of replacement of the sanitary sewer systems serving the residential units.
JIATF South Headquarters Relocation, Naval Station Truman Annex Keywest, Florida: Electrical Engineer for the design of renovation of three existing buildings totaling 70,000 square feet to accommodate relocation of the Joint Interagency Task Force South headquarters. Involved interior reconfiguration, new HVAC and electrical/lighting systems, power distributions, raised computer floors, water leak detection in raised floor, new x-ray equipment at entry point, power operated hurricane shutter.
Buildings 638, 639, 1350 and 1351: Electrical Engineer for the design of the interior complete remodeling of these four Bachelor Enlisted Quarters buildings totaling 103,600 square feet.
Target Support Facility, AUTEC, Andros Island, Bahamas: Electrical Engineer for the design of a new single story, pre-engineered metal building system for storage and maintenance of QST and HSMST boats.
Marina Bay Café, MacDill Air Force Base, Tampa, Florida: Electrical Engineer for the design of a new 6,375-square-foot waterfront restaurant.
Power Feasibility Study, Ramstein Airforce Base, Germany: Electrical Engineer for the feasibility study of the existing power capacity and load flow study of the entire base power distribution system.
Wickers Field, Key West, Florida: Electrical Engineer for the design of a new concession stands, central public restrooms, and press boxes associated with renovation and expansion of the public recreational facility serving softball, soccer and football leagues.
MS “A” School (Building 630), Pensacola Naval Air Station, Florida: Electrical Engineer for the design of a $4.1-million, 36,420-square-foot facility, which entailed total renovation of an existing historic hangar and conversion of the building to classroom/office/ laboratory use.
Building Projects Page 2 |
Defense Projects Page 2 |
Defense Projects Page 3 |